Make a donation
Ada Ciganlija topographic map
Click on the map to display elevation.
Make a donation
Ada Ciganlija
The pollution of the bay continued, including two atmospheric precipitation collectors which overspill into the bay, to which the fecal sewage is illegally connected, and the bay was described as the ecological time bomb. In December 2019 the winning project was announced. It includes the transformation of the bay into the artificial whitewater and the proper marina. A project by Aleksandar Nedeljković, named "Flight of the gull" envisions the reconstruction and elevation of all embankments along the bay's banks, turning them into the vertical retaining walls. Pumps for the creation of the whitewater by day, would be used to purify the water by night and prevent the sludge from depositing on the bottom. Proposed name for the marina and sports center is "Whitewater Arena". However, this project, just like some others from the competition (conducting the Topčiderka directly into the main Sava riverbed by the pipes) does not tackle the problem of the already existing sludge deposits or the toxicity of the waste. Also, it was outright labeled as way too expensive, even by its authors (up to €70 million).
Make a donation
About this map
Name: Ada Ciganlija topographic map, elevation, terrain.
Average elevation: 77 m
Minimum elevation: 66 m
Maximum elevation: 141 m
Make a donation
